Skip to content
Once the permit is granted, a single contact person coordinates all trades.+41 79 557 14 50
Logo Entreprise du Bâtiment MS SAentreprise-de-maconnerie-ms-sa.ch

Your load-bearing masonry company in Geneva

Construction of load-bearing walls in Geneva

A load-bearing wall receives the weight of a floor, a slab or a roof. Its construction or reinforcement always follows a study carried out by an appointed civil engineer, who sets the material, the thickness, the reinforcement and the foundation. Our team then builds the wall from these drawings.

We build load-bearing walls for extensions, refitted basements, floor support and conversions where the distribution of the bearings changes. You explain your project, and we tell you how it can be built.

No-obligation quote Call +41 79 557 14 50

What we do

Depending on the study, the load-bearing wall is built in high-strength brick, in filled and reinforced concrete block, or cast in reinforced concrete for small works. We also build the elements that go with it.

  • Load-bearing walls in brick and concrete block
  • Walls in shuttering blocks, reinforced and filled with concrete
  • Small footings and ground beams
  • Horizontal ring beams and vertical stiffeners
  • Piers and columns in masonry or reinforced concrete
  • Reinforcement of an existing wall by lining or jacketing

How we work

After the visit, we put you in touch with a civil engineer or we work with the one you have already appointed. The engineer surveys the structure, calculates the forces and draws up the construction drawings. Our masonry quote is prepared on this basis, which avoids estimating blind.

On site, we begin with the foundation or with the preparation of the existing bearing. The reinforcement is placed according to the reinforcement drawing, then the wall is built or shuttered. The engineer checks the reinforcement before concreting, and we only pour after this inspection.

When the new wall has to support an existing floor, temporary props remain in place until the masonry has reached the strength required by the engineer.

Specifics in Geneva

In Geneva, altering the load-bearing structure of a building is a matter that the authorities, property managers and condominiums look at closely. The owner of the building must approve the project, and a permit application may be required depending on the nature of the work. In that case, work begins once the permit has been obtained.

Buildings from different periods do not have the same frame. Masonry cross walls in old buildings, concrete slabs and walls in more recent constructions, each case calls for a reading of the structure. That is the role of the civil engineer, and the reason why we never propose a load-bearing solution without such a study.

What helps us prepare your quote

  • The plans of the building, even old ones
  • Your engineer’s report or drawings if you have them
  • The location of the future wall and what it will have to carry
  • The type of floor above, timber, hollow block or concrete slab
  • The nature of the ground or slab on which it will rest
  • The contact details of your architect or property manager

Frequently asked questions

Does your company calculate load-bearing walls itself?

No. Structural design is the work of an appointed civil engineer. Our masons build the wall following the engineer’s drawings and instructions.

Can an existing partition be made load-bearing?

Rarely as it stands. A partition has neither the thickness nor the foundation intended for that. The engineer indicates whether it should be lined, replaced or whether a bearing should be created elsewhere.

Who appoints the civil engineer?

Most often the owner, directly or through the architect. If you do not know one, we can point you to offices we are used to working with.

Do the rooms have to be emptied during the work?

The area beneath and around the future wall must be clear for the props and for moving materials.

No-obligation quote

Tell us about your project. We call you back to arrange a visit, then we send you a no-obligation quote. Our team works in French.